Project: High efficiency and energy-saving factory management system engineering project for new factory buildings
Location:Dongguan, Guangdong
Time:2024
Service scope:Efficient refrigeration station, purification decoration, water supply and drainage, electrical, purification HVAC, intelligence, process pure water pipeline, process wastewater pipeline, process wastewater, process waste exhaust
Main features: The total installation area of the project is approximately 12000 square meters. Among them: 400 square meters of 1000 level purification area and 3600 square meters of 10000 level purification area. Design a plan and construction general contracting based on the production requirements of the process. (Especially the temperature control stability in the ultra precision zone needs to be within the nanometer range)
Confidentiality NoticeThis case involves the client's trade secrets, and it is strictly prohibited to reprint or quote them in any form to the outside world. Violators will be held accountable in accordance with the law.
