Electronic Semiconductor

服务晶圆厂、封测厂与上游配套企业,沉淀标准化交付经验。

Huizhou Yiwei Lithium Energy Co., Ltd

Project: Automotive Soft Pack Stacked Battery Project (Phase III) Water Storage Cooling Central Air Conditioning Control System Engineering and Automatic Control System Engineering

Location:Huizhou, Guangdong

Time:2020

Service scope:Efficient Cold Station Control System Engineering and Automatic Control System Engineering

Main features:The project is located in Huizhou, and the main demand for air conditioning water in this project is for process dehumidification and air conditioning cooling. It provides uninterrupted cooling 24 hours a day, 360 days a year. The air conditioning system is divided into electrode+assembly building and active building for separate cooling. The project combines an efficient computer room with a cold storage system, with a cooling capacity requirement of 8636RT/h and a water supply temperature adjustable within the range of 4-10 ℃. The total designed capacity of cold storage is 60000 RTh. Based on the actual situation of the project, load models, equipment energy consumption models, and optimization control models were established. The peak load for the whole year is 6000RT, and the minimum load for the whole year is 2160RT.

 

 

Confidentiality NoticeThis case involves the client's trade secrets, and it is strictly prohibited to reprint or quote them in any form to the outside world. Violators will be held accountable in accordance with the law.