Project: Supply and Installation of Grinding Fluid System for Xinzhuo Semiconductor Industrialization Construction Project
Location:Wuxi, Jiangsu
Time:2021
Service scope:Grinding fluid supply system engineering
Main features:This project covers an area of approximately 100000 square meters, with a building area of approximately 150000 square meters and a construction period of 14 months. This project is a comprehensive package project for the equipment of the grinding fluid supply system, including the integration of control supply system and SCADA (monitoring system), covering the construction and operation testing supply of 1F raw material conveying system equipment and mixing and dilution system supply system equipment, as well as the completion of the construction of the grinding fluid supply system.
Confidentiality NoticeThis case involves the client's trade secrets, and it is strictly prohibited to reprint or quote them in any form to the outside world. Violators will be held accountable in accordance with the law.
