Electronic Semiconductor

服务晶圆厂、封测厂与上游配套企业,沉淀标准化交付经验。

Jingmen Yiwei Chuangneng Lithium Battery Co., Ltd

Project: Automatic Control System Engineering for Central Air Conditioning Installation in Q93 Sixth Laboratory Power Station of Hubei Yiwei Power Zone 2

Location:Jingmen, Hubei

Time:2020

Service scope:Efficient Cold Station Automatic Control System Engineering

Main features:Construct an energy-saving automation control system for the ultra efficient central air conditioning chiller room, combining chiller operation data, variable frequency control of chilled water pumps, variable frequency control of cooling water pumps, and variable frequency control of cooling towers. Through joint simulation analysis, ensure that the entire refrigeration station system operates optimally in terms of overall energy efficiency while meeting the end cooling load requirements.

 

 

Confidentiality NoticeThis case involves the client's trade secrets, and it is strictly prohibited to reprint or quote them in any form to the outside world. Violators will be held accountable in accordance with the law.