Project: New Circuit Board Project
Location:Zhuhai, Guangdong
Time:2020
Service scope:Efficient Cold Station New Circuit Board Project
Main features:For efficient computer rooms, the technical solution of this project ensures that the annual average operating energy efficiency COP of the refrigeration room is ≥ 6.0. Analyze the results and characteristics of the air conditioning load for this project, select the capacity of the chiller unit reasonably, and develop the most energy-efficient operating strategy. Monitor and adjust the system operation status at all times. Reasonably optimize pipelines and maintain water balance in each pipeline.
Confidentiality NoticeThis case involves the client's trade secrets, and it is strictly prohibited to reprint or quote them in any form to the outside world. Violators will be held accountable in accordance with the law.
