Project: Zhuhai Zhongjing 5G Communication Electronic Circuit Project Phase I Efficient Refrigeration Room Project
Location:Zhuhai, Guangdong
Time:2021
Service scope:Efficient refrigeration room project
Main features:Constructing an ultra efficient central air conditioning chiller room, combining chiller operation data, variable frequency control of chilled water pumps, variable frequency control of cooling water pumps, and variable frequency control of cooling towers. Through joint simulation analysis, the entire refrigeration station system is ensured to operate efficiently while meeting the end cooling load requirements.
Confidentiality NoticeThis case involves the client's trade secrets, and it is strictly prohibited to reprint or quote them in any form to the outside world. Violators will be held accountable in accordance with the law.
