Project: FAB2 and Supporting Facilities Construction Mechanical and Electrical Design, Procurement, and Construction Engineering for the National Memory Base Project (Phase I)
Location:Wuhan, Hubei
Time:2021
Service scope:Expansion of self-control FMCS and security system, IT data room
Main features:The total area of the factory is 1717 acres, with a planned total construction area of approximately 1.7 million square meters. The construction will be carried out in three phases, and the overall plan includes three 12 inch 3D NAND memory chip production plants (FAB1, FAB2, FAB3) (each plant has a clean production area of 68000 square meters and a production capacity of 100000 pieces per month).
Confidentiality NoticeThis case involves the client's trade secrets, and it is strictly prohibited to reprint or quote them in any form to the outside world. Violators will be held accountable in accordance with the law.